Solar Installation
Instructions for reporting and data points for solar installations.
Please list customer data horizontally on an Excel spreadsheet, CSV File, or Google Sheet.
Please send batch reports to: contractor.support@pearlcertification.com
Minimum data points required for a Solar Home Performance Report to be issued:
Homeowner Information | Solar/PV System Installation |
A. Homeowner Name | A. Type of Ownership (owned/financed/leased/PPA) |
B. Property Address | B. System Size |
C. Homeowner Email | C. Utility Provider or Rate (if left blank - we default to State Average) |
D. Install Date | |
E. Inverter Type or Manufacturer |
Supplemental data points available for inclusion on a report:
While these data points are not required, including them, if possible, makes for a more robust report for homeowners.
Solar/PV Installation | Energy Storage/Charging |
A. Panel Manufacturer | A. Battery Manufacturer |
B. Panel Model Number | B. Battery Model Number |
C. Array Type (roof/ground-mounted) | C. EV Charger Manufacturer |
D. Inverter Manufacturer | D. EV Model Number |
E. Inverter Model Number | |
F. Annual Energy Production (kWh) | |
G. Electricity Offset (%) |
IF PROVIDED with the full manufacturer and model numbers, Pearl’s data team will pull in all efficiency ratings and data.